The first step in creating a BIM model from a point cloud is to align the building levels to the point cloud.
A red arrow allows you to change the floor height.
A gray plus sign means adding a new level.
The graphic settings can be adjusted to the desired values in the levels dialog.
Location of the command: Building - Point Cloud - Adjust floor structure
Commands:
Red arrow - changing the height of the floor
Gray plus sign above - add new level above
Gray plus sign below - add new level below
Black arrow - moving the point cloud, the given point is moved to the 0 level height
Comments
0 comments
Article is closed for comments.