You can specify the Project base point (local coordinate system) by giving the new origin and the direction of the X axis.
When you create first time the model, the project base point is located at the world coordinate system (WCS) origin.
When working with the project base point, keep the following in mind:
- The project base point appears only in the floor plan view.
- You cannot delete the project base point, but you can move it.
- Project North defines the Y axis of the project base point.
Specifying the location of the project base point:
1. Place the Project base point
2. Specify the model's orientation by rotating the X axis.
Comments
0 comments
Article is closed for comments.